{"id":129,"date":"2018-08-08T18:50:44","date_gmt":"2018-08-08T15:50:44","guid":{"rendered":"http:\/\/consto.themezinho.net\/?p=129"},"modified":"2024-10-14T14:53:59","modified_gmt":"2024-10-14T11:53:59","slug":"new-project-izgrev","status":"publish","type":"post","link":"https:\/\/unistroy.bg\/en\/new-project-izgrev\/","title":{"rendered":"Unistroy begins construction of a new project in the &#8220;Izgrev&#8221; neighborhood, Burgas, in August 2018"},"content":{"rendered":"<p>Construction of Unistroy&#8217;s new project in Burgas began in August 2018. The building is located in the &#8220;Izgrev&#8221; residential complex, with a construction period of 18 months. The building will have nine floors, adhering to the height limit of 26 meters according to the Urban Development Law (ZUT).<\/p>\n<p>The project features an exceptionally attractive modern exterior. It includes 7 retail units with a total built-up area of 2,604.59 square meters. There are 18 office spaces with a total area of 1,074.10 square meters. The building also contains 89 residential units. Of these, 77 are one-bedroom apartments, 10 are two-bedroom units (including two maisonettes), and 2 are three-bedroom apartments (one of which is a maisonette). The total built-up area of the residential units is 5,548.45 square meters.<\/p>\n<p>The building also offers a significant number of parking spaces, located within the property, including two underground levels accessible via a ramp, stairs, and elevators. Basement level 2, at an elevation of -6.10 meters, provides parking for 51 vehicles, while basement level 1, at an elevation of -2.75 meters, offers spaces for an additional 43 vehicles.<\/p>\n<p>In line with the latest trends in &#8220;green&#8221; mobility and legal requirements, the Unistroy Holding project includes dedicated bicycle parking spaces. A total of 178 bicycle spaces are provided, 23 of which are located outdoors, while the remaining 155 are housed in two storage rooms, each with an area of 47.73 square meters, situated on the two underground levels.<\/p>\n<p>The building&#8217;s plot coverage is 71.60%, and the total gross floor area (including the underground floors) is 14,155 square meters.<\/p>\n<p>The building features a modern, urban design with clean lines. The color palette is monochromatic and soft. Panoramic windows ensure plenty of natural light in the rooms, while the unique architectural solutions make this project a valuable asset to the contemporary landscape of Burgas.<br \/>\n<\/p>","protected":false},"excerpt":{"rendered":"<p>Construction of Unistroy&#8217;s new project in Burgas began in August 2018. The building is located in the &#8220;Izgrev&#8221; residential complex, with a construction period of 18 months. The building will have nine floors, adhering to the height limit of 26 meters according to the Urban Development Law (ZUT). The project features an exceptionally attractive modern [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1251,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-129","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Unistroy begins construction of a new project in the &quot;Izgrev&quot; neighborhood, Burgas, in August 2018 - Unistroy-second version<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Unistroy begins construction of a new project in the &quot;Izgrev&quot; neighborhood, Burgas, in August 2018 - Unistroy-second version\" \/>\n<meta property=\"og:description\" content=\"Construction of Unistroy&#8217;s new project in Burgas began in August 2018. The building is located in the &#8220;Izgrev&#8221; residential complex, with a construction period of 18 months. The building will have nine floors, adhering to the height limit of 26 meters according to the Urban Development Law (ZUT). The project features an exceptionally attractive modern [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/\" \/>\n<meta property=\"og:site_name\" content=\"Unistroy-second version\" \/>\n<meta property=\"article:published_time\" content=\"2018-08-08T15:50:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-14T11:53:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dev.unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1875\" \/>\n\t<meta property=\"og:image:height\" content=\"1172\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/\",\"url\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/\",\"name\":\"Unistroy begins construction of a new project in the \\\"Izgrev\\\" neighborhood, Burgas, in August 2018 - Unistroy-second version\",\"isPartOf\":{\"@id\":\"https:\/\/dev.unistroy.bg\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg\",\"datePublished\":\"2018-08-08T15:50:44+00:00\",\"dateModified\":\"2024-10-14T11:53:59+00:00\",\"author\":{\"@id\":\"https:\/\/dev.unistroy.bg\/#\/schema\/person\/602159de8f566e6a60f9beeaa5891b13\"},\"breadcrumb\":{\"@id\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[[\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/\"]]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#primaryimage\",\"url\":\"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg\",\"contentUrl\":\"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg\",\"width\":1875,\"height\":1172},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/unistroy.bg\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Unistroy begins construction of a new project in the &#8220;Izgrev&#8221; neighborhood, Burgas, in August 2018\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dev.unistroy.bg\/#website\",\"url\":\"https:\/\/dev.unistroy.bg\/\",\"name\":\"Unistroy-second version\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dev.unistroy.bg\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/dev.unistroy.bg\/#\/schema\/person\/602159de8f566e6a60f9beeaa5891b13\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/dev.unistroy.bg\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62b221fbe0489e992bd125bd37d73897bbb31643efa698acd65116676ad552ab?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62b221fbe0489e992bd125bd37d73897bbb31643efa698acd65116676ad552ab?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/unistroy.bg\"],\"url\":\"https:\/\/unistroy.bg\/en\/author\/admin_r42xlnhq\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Unistroy begins construction of a new project in the \"Izgrev\" neighborhood, Burgas, in August 2018 - Unistroy-second version","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/","og_locale":"en_US","og_type":"article","og_title":"Unistroy begins construction of a new project in the \"Izgrev\" neighborhood, Burgas, in August 2018 - Unistroy-second version","og_description":"Construction of Unistroy&#8217;s new project in Burgas began in August 2018. The building is located in the &#8220;Izgrev&#8221; residential complex, with a construction period of 18 months. The building will have nine floors, adhering to the height limit of 26 meters according to the Urban Development Law (ZUT). The project features an exceptionally attractive modern [&hellip;]","og_url":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/","og_site_name":"Unistroy-second version","article_published_time":"2018-08-08T15:50:44+00:00","article_modified_time":"2024-10-14T11:53:59+00:00","og_image":[{"width":1875,"height":1172,"url":"https:\/\/dev.unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/","url":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/","name":"Unistroy begins construction of a new project in the \"Izgrev\" neighborhood, Burgas, in August 2018 - Unistroy-second version","isPartOf":{"@id":"https:\/\/dev.unistroy.bg\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#primaryimage"},"image":{"@id":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#primaryimage"},"thumbnailUrl":"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg","datePublished":"2018-08-08T15:50:44+00:00","dateModified":"2024-10-14T11:53:59+00:00","author":{"@id":"https:\/\/dev.unistroy.bg\/#\/schema\/person\/602159de8f566e6a60f9beeaa5891b13"},"breadcrumb":{"@id":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":[["https:\/\/dev.unistroy.bg\/new-project-izgrev\/"]]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#primaryimage","url":"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg","contentUrl":"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg","width":1875,"height":1172},{"@type":"BreadcrumbList","@id":"https:\/\/dev.unistroy.bg\/new-project-izgrev\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/unistroy.bg\/en\/"},{"@type":"ListItem","position":2,"name":"Unistroy begins construction of a new project in the &#8220;Izgrev&#8221; neighborhood, Burgas, in August 2018"}]},{"@type":"WebSite","@id":"https:\/\/dev.unistroy.bg\/#website","url":"https:\/\/dev.unistroy.bg\/","name":"Unistroy-second version","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dev.unistroy.bg\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/dev.unistroy.bg\/#\/schema\/person\/602159de8f566e6a60f9beeaa5891b13","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dev.unistroy.bg\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62b221fbe0489e992bd125bd37d73897bbb31643efa698acd65116676ad552ab?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62b221fbe0489e992bd125bd37d73897bbb31643efa698acd65116676ad552ab?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/unistroy.bg"],"url":"https:\/\/unistroy.bg\/en\/author\/admin_r42xlnhq\/"}]}},"jetpack_featured_media_url":"https:\/\/unistroy.bg\/wp-content\/uploads\/2014\/12\/izv.jpg","_links":{"self":[{"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/posts\/129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/comments?post=129"}],"version-history":[{"count":14,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/posts\/129\/revisions"}],"predecessor-version":[{"id":2626,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/posts\/129\/revisions\/2626"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/media\/1251"}],"wp:attachment":[{"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/media?parent=129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/categories?post=129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/unistroy.bg\/en\/wp-json\/wp\/v2\/tags?post=129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}